[Date Prev][Date Next][Thread Prev][Thread Next][Author Index][Date Index][Thread Index]
Weekly Planning Meeting, 5/02
- To: <us>
- Subject: Weekly Planning Meeting, 5/02
- From: Marc Stiegler <marcs>
- Date: Sun, 6 May 90 16:26:51 PDT
Highlights 4/24:
The big congratulations this week go to dean and joel and sue.
Dean has 2D regions working (and he added double-click to fm
in his spare time). Meanwhile, joel and sue have finished, really
completely finished, the next info packet: it's in the print
shop now, and soon a thousand copies will be roaming the planet's
surface.
Meetings: Hugh, dean, fm on the mac. Roger, hugh, reproducible
Tapestry tests. Marcs, paul, good journals on hypertext. Michael,
wjr, pull file off exobyte. Rick, ravi, friday at noon, the backend
in C++. Hugh, michael, finding changes in smalltalk. Markm, rick,
marcs, discuss the capture of randy smith.
Anyway, this week's task list is as follows:
A. dean
x 5/02/90 isequal in tables working
x 5/02/90 double click working in fm
x 5/02/90 2d regions
5/07/90 make fm event based not polling
5/07/90 make for-each compile
5/07/90 get rid of test function special case
5/07/90 compile fm with roger
5/07/90 fix portions in fm for roger
5/14/90 design archiving
5/14/90 backend-disk interface (BeDi)
5/23/90 inclusion list coord space
5/23/90 allocation sequence numbers
5/23/90 printing sequence numbers
B. hill
x 4/31/90 turn new X++ into a release
5/07/90 printfs autotrace in C++ from smalltalk
5/30/89 write mail about X++ upgrades and garbage collection for bobp
C. hugh
5/07/90 put example code in files for roger
5/07/90 compile febe on mac
5/07/90 compile fm on mac
5/07/90 X++ running on Mac
5/14/90 finish attribute design
5/14/90 get variants working in link pane
D. markm
5/09/90 props, canopies
5/07/90 initial doc of public club
5/07/90 enforcement of clubs
6/24/90 complete to do list from alpha 3
6/27/90 respond to semantics email
E. marcs
x 5/02/90 prep for monthly meeting
5/09/90 draft of "why true links are hard to do"
5/16/90 new, super detailed PERT
5/17/90 tapestry mockup in open look
5/24/90 start second round of patenting work
5/30/89 figure out whether links are standalone objects
5/30/90 discuss stubble for ADI with autodesk
F. michael
5/09/90 list of reserved message names in translator
5/09/90 re-assess tasks
5/27/90 figure out ent
G. ravi
x 5/02/90 get febe to compile again
x 5/02/90 make febe run over stubble
5/09/90 Execute Backend Under C++!
5/09/90 names on methods, and 1.2MB of space
5/09/90 put revert into change manager
H. bobp
x 5/02/90 talk to kathleen marvin some more about documentation
5/09/90 more with marcs, joel on documentation staffing
5/09/90 ship bound sys overview
5/17/90 sensors in the overview
I. roger
5/09/90 get fm running under open look
J. roland
5/09/90 stubble doing everything ravi needs for compile
5/09/90 install better parser
5/09/90 fix line numbering in crtuch
5/17/90 run ceran over the whole world
5/30/90 write grammar for formic
5/30/90 parser with expression semantics
5/30/90 xlint check for assign to a parameter variable and assignment to "this"
5/28/90 automatic documenter
K. Bill
5/09/90 get exobyte repaired
4/17/90 work toward a yacc that parses C++
4/17/90 figure out the backup setup
K. Joel
x 5/02/90 info packet to printers
L. Jacque
5/09/90 XOC for the IBM presentation
5/09/90 outline of tapestry documentation
L. Rick
x 4/17/90 doc view, list viewer
x 4/17/90 controllers
4/24/90 round 2 with key logic
L. Small Tasks List
Cleanup region code
Sequence # in smalltalk, dean & michael versions
Test files
L. Deferred Meetings:
Bobp, joel, marcs, discuss Apple and smalltalk.
Marcs, dean, joel, parc place strategy.
Dean, michael, structured debug on the ent.
Michael, dean, break up the ent for the disk on Tuesday.
Michael, dean, markm, ravi, efficiency of internsets.
Roger,, hugh, dean, ravi discuss system independent attributes
for the frontends after fm does paragraphs.
Roland, dean, discuss xlint commands in smalltalk.
Markm, hill, discuss explicit deletion of orgls & refcount deletion.
Markm, hill, discuss exception handling on sensors between comm handlers.
Dean, roger, michael, markm, discuss sequence numbers of size 4 billion.
Dean, markm, discuss intersecting backfollow ideas.
joel, marcs, discuss terminology in X++ for developer release
(particularly necromancers and related tools)
Ravi, roger, discuss common view.
M. Unassigned
merge contact databases
scenario documents (markm, dean
Tumblers as subclass of partiallyOrdered
tutorial for users on the frontend
reference manual for users on the frontend
test scaffolding, code exercisers
rollin, rollout a la Univac
subaccounts, permissions on FE
sys admin, i.e., archiving and partitioning disks
--marcs